TEST PLAN: FOOD DELIVERY MOBILE APPLICATION
TEST PLAN: FOOD DELIVERY MOBILE APPLICATION
1. INTRODUCTION
Project Name: Food Delivery Mobile Application
Version: 1.0
Platform: Android & iOS
Prepared By: QA Team
Date: November 2025
Purpose: This test plan outlines the testing strategy, scope, resources, and schedule for testing the Food Delivery mobile application to ensure it meets quality standards before release.
2. TEST OBJECTIVES
- Verify all functional requirements are working correctly
- Ensure application performance meets specified benchmarks
- Validate UI/UX across different mobile devices and screen sizes
- Test security features including payment gateway integration
- Verify compatibility with different OS versions
- Ensure data integrity and proper error handling
3. SCOPE OF TESTING
3.1 In Scope
- User registration and login functionality
- Restaurant browsing and search features
- Menu viewing and item selection
- Cart management (add, remove, modify items)
- Order placement and tracking
- Payment gateway integration
- Notification system (push notifications)
- User profile management
- Order history
- Ratings and reviews
- GPS and location services
3.2 Out of Scope
- Backend server testing (handled separately)
- Third-party API testing beyond integration points
- Restaurant partner portal
4. TEST STRATEGY
4.1 Types of Testing
Functional Testing
- Test all features against requirements
- Verify user workflows end-to-end
- Validate business logic
Usability Testing
- Test user interface design and navigation
- Verify ease of use and user experience
- Test accessibility features
Performance Testing
- Load time testing
- App response time
- Battery consumption testing
- Memory usage monitoring
Security Testing
- Authentication and authorization
- Payment security
- Data encryption
- Session management
Compatibility Testing
- Different Android versions (10, 11, 12, 13, 14)
- Different iOS versions (15, 16, 17, 18)
- Various screen sizes and resolutions
- Different network conditions (4G, 5G, WiFi)
Installation Testing
- Fresh installation
- Update installation
- Uninstallation
5. TEST DELIVERABLES
- Test Plan Document (this document)
- Test Cases Document
- Test Execution Report
- Defect Reports
- Test Summary Report
- Test Metrics and Coverage Report
6. TEST ENVIRONMENT
Hardware Requirements:
- Android devices: Samsung Galaxy S21, OnePlus 9, Pixel 6
- iOS devices: iPhone 12, iPhone 13 Pro, iPhone 14
- Tablets: iPad Air, Samsung Galaxy Tab
Software Requirements:
- Android OS: Versions 10, 11, 12, 13, 14
- iOS: Versions 15, 16, 17, 18
- Network simulators for various connection speeds
- Payment gateway test environment
Tools:
- Test Management: JIRA, TestRail
- Automation: Appium, XCUITest, Espresso
- Performance: JMeter, LoadRunner
- Bug Tracking: JIRA
- Device Cloud: BrowserStack, Sauce Labs
7. TEST SCHEDULE
| Phase | Duration | Activities |
| Test Planning | Week 1 | Create test plan, define scope |
| Test Case Design | Week 2-3 | Write test cases, review |
| Test Environment Setup | Week 3 | Configure devices, tools |
| Test Execution | Week 4-6 | Execute manual and automated tests |
| Defect Reporting | Week 4-6 | Log and track defects |
| Regression Testing | Week 7 | Re-test fixed defects |
| Test Closure | Week 8 | Final report and sign-off |
8. ENTRY AND EXIT CRITERIA
Entry Criteria
- Test plan approved by stakeholders
- Test environment ready with all required devices
- Build deployed to test environment
- Test data prepared
- Test cases reviewed and approved
Exit Criteria
- 100% test case execution completed
- No critical or high-severity defects open
- 95% pass rate achieved
- Performance benchmarks met
- Stakeholder sign-off received
9. RISK AND MITIGATION
| Risk | Impact | Mitigation |
| Device unavailability | High | Use cloud-based device farms |
| Delayed builds | Medium | Buffer time in schedule |
| Third-party API failures | High | Use mock services for testing |
| Resource unavailability | Medium | Cross-train team members |
| Payment gateway issues | High | Maintain test payment accounts |
10. TEST TEAM
- Test Manager: 1 person - Overall test coordination
- Test Leads: 2 people - Test design and execution oversight
- Manual Testers: 4 people - Manual test execution
- Automation Engineers: 2 people - Automation framework and scripts
- Performance Tester: 1 person - Performance testing
11. DEFECT MANAGEMENT
Severity Levels:
- Critical: Application crash, data loss, security breach
- High: Major functionality broken, no workaround
- Medium: Functionality impaired, workaround available
- Low: Minor issues, cosmetic defects
Priority Levels:
- P1: Fix immediately
- P2: Fix in current release
- P3: Fix in next release
- P4: Fix if time permits
12. APPROVAL
This test plan requires approval from:
- Project Manager
- Development Lead
- QA Manager
- Product Owner