TEST PLAN: FOOD DELIVERY MOBILE APPLICATION

 TEST PLAN: FOOD DELIVERY MOBILE APPLICATION

 1. INTRODUCTION

Project Name: Food Delivery Mobile Application  

Version: 1.0  

Platform: Android & iOS  

Prepared By: QA Team  

Date: November 2025

Purpose: This test plan outlines the testing strategy, scope, resources, and schedule for testing the Food Delivery mobile application to ensure it meets quality standards before release.

2. TEST OBJECTIVES

- Verify all functional requirements are working correctly

- Ensure application performance meets specified benchmarks

- Validate UI/UX across different mobile devices and screen sizes

- Test security features including payment gateway integration

- Verify compatibility with different OS versions

- Ensure data integrity and proper error handling

3. SCOPE OF TESTING

3.1 In Scope

- User registration and login functionality

- Restaurant browsing and search features

- Menu viewing and item selection

- Cart management (add, remove, modify items)

- Order placement and tracking

- Payment gateway integration

- Notification system (push notifications)

- User profile management

- Order history

- Ratings and reviews

- GPS and location services

3.2 Out of Scope

- Backend server testing (handled separately)

- Third-party API testing beyond integration points

- Restaurant partner portal

4. TEST STRATEGY

 4.1 Types of Testing

Functional Testing

- Test all features against requirements

- Verify user workflows end-to-end

- Validate business logic

Usability Testing

- Test user interface design and navigation

- Verify ease of use and user experience

- Test accessibility features

Performance Testing

- Load time testing

- App response time

- Battery consumption testing

- Memory usage monitoring

Security Testing

- Authentication and authorization

- Payment security

- Data encryption

- Session management

Compatibility Testing

- Different Android versions (10, 11, 12, 13, 14)

- Different iOS versions (15, 16, 17, 18)

- Various screen sizes and resolutions

- Different network conditions (4G, 5G, WiFi)

Installation Testing

- Fresh installation

- Update installation

- Uninstallation

5. TEST DELIVERABLES

- Test Plan Document (this document)

- Test Cases Document

- Test Execution Report

- Defect Reports

- Test Summary Report

- Test Metrics and Coverage Report

6. TEST ENVIRONMENT

Hardware Requirements:

- Android devices: Samsung Galaxy S21, OnePlus 9, Pixel 6

- iOS devices: iPhone 12, iPhone 13 Pro, iPhone 14

- Tablets: iPad Air, Samsung Galaxy Tab

Software Requirements:

- Android OS: Versions 10, 11, 12, 13, 14

- iOS: Versions 15, 16, 17, 18

- Network simulators for various connection speeds

- Payment gateway test environment

Tools:

- Test Management: JIRA, TestRail

- Automation: Appium, XCUITest, Espresso

- Performance: JMeter, LoadRunner

- Bug Tracking: JIRA

- Device Cloud: BrowserStack, Sauce Labs

 7. TEST SCHEDULE

| Phase | Duration | Activities |

| Test Planning | Week 1 | Create test plan, define scope |

| Test Case Design | Week 2-3 | Write test cases, review |

| Test Environment Setup | Week 3 | Configure devices, tools |

| Test Execution | Week 4-6 | Execute manual and automated tests |

| Defect Reporting | Week 4-6 | Log and track defects |

| Regression Testing | Week 7 | Re-test fixed defects |

| Test Closure | Week 8 | Final report and sign-off |

8. ENTRY AND EXIT CRITERIA

 Entry Criteria

- Test plan approved by stakeholders

- Test environment ready with all required devices

- Build deployed to test environment

- Test data prepared

- Test cases reviewed and approved

 Exit Criteria

- 100% test case execution completed

- No critical or high-severity defects open

- 95% pass rate achieved

- Performance benchmarks met

- Stakeholder sign-off received

9. RISK AND MITIGATION

| Risk | Impact | Mitigation |

| Device unavailability | High | Use cloud-based device farms |

| Delayed builds | Medium | Buffer time in schedule |

| Third-party API failures | High | Use mock services for testing |

| Resource unavailability | Medium | Cross-train team members |

| Payment gateway issues | High | Maintain test payment accounts |

 10. TEST TEAM

- Test Manager: 1 person - Overall test coordination

- Test Leads: 2 people - Test design and execution oversight

- Manual Testers: 4 people - Manual test execution

- Automation Engineers: 2 people - Automation framework and scripts

- Performance Tester: 1 person - Performance testing

11. DEFECT MANAGEMENT

Severity Levels:

- Critical: Application crash, data loss, security breach

- High: Major functionality broken, no workaround

- Medium: Functionality impaired, workaround available

- Low: Minor issues, cosmetic defects

Priority Levels:

- P1: Fix immediately

- P2: Fix in current release

- P3: Fix in next release

- P4: Fix if time permits

12. APPROVAL

This test plan requires approval from:

- Project Manager

- Development Lead

- QA Manager

- Product Owner